Role: Construction Manager

Mercy Restaurant – Minneapolis, MN

This interior remodel of an existing restaurant took six weeks start to finish. This remodel featured additions of real timber, re-purposing of antique windows, construction of custom lighting, hand painted murals on exterior walls, and use of hand glazed tiles.  

Titan Machinery – Shared Resource Center – Fargo, ND

Located in West Fargo, ND this facility provided Titan Machinery with a shared resource center for the company’s 91 Case IH, New Holland, Case Construction, and New Holland Construction dealerships. SRC provides accounting, information technology, marketing, training, whole goods, and warehouse space for critical parts that have a long lead time. The facility features a …

Titan Machinery – Shared Resource Center – Fargo, ND Read More »

Titan Machinery – Moorhead, MN

Titan Machinery’s flagship facility in Moorhead, MN combines functionality with energy efficiency. This facility uses waste oil from store to power its in-floor heat system which is located in the shop, washbay, parts area, and expo room. This provides a fuel at virtually no cost to heat the majority of the system. The shop features …

Titan Machinery – Moorhead, MN Read More »

Titan Machinery CE – Sioux City, IA

20,358 SF footprint, slab on grade, metal framed building. 2,040 SF 2nd floor with office/mech/storage and 1,519 SF 2nd floor parts warehouse. 12,000 SF Storage Building

Titan Machinery – Marshall, MN

Building Description: 41,650 SF footprint, slab on grade, metal framed building with 4,398 SF 2nd floor = 46,048 SF Total Shop Includes (2) Five ton Single Girder Under Running R&M Bridge Cranes and (6) Three ton Gorbel Wall Bracket JIB Cranes